Castings in Construction - Steel

SteelCastings - High-quality construction castings manufactured in our factory. Contact us for custom steel products for your construction needs.
Request a Quote

PRODUCTS DETAILS

  • Overview
  • Product Parameters
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Material Inspection Report
Material Inspection Report
Dimension Report
Dimension Report
Standard
DIN
Certification
ISO 9001:2000
Process
Sodium Silicate-Bonded Sand Casting
Drawing
Customer Provide
Installation
Installation Test
Capacity
>40 Tons Per Day
Sample
Available
Delivery Time
20 Days
Specific Material Grade
Mn13,Mn13cr2,Mn17cr2,30cr5mo
Characters
More Durable
Transport Package
Steel Pack
Specification
20kg to 50kg
Trademark
LXS
Origin
China
HS Code
8474900000
Production Capacity
15000PCS/Month

Product Description

Castings in Construction - Steel
Product Parameters
Castings in Construction - Steel
Castings in Construction - Steel
Product Description
wear parts for  concrete mixers
 

Product Application

Suitable brand:  twin shaft concrete mixer

Suitable mixer type: 
--DW 2.25/ --DW 2.5/ --DW 3.0/ --DW 3.5/ --DW 4.5/ --DW 6.0

 

Spare parts we can supply:
--Right lateral arm  /Left lateral arm  /Central arm
--lateral arm counterparts  /Central arm counterparts
--Left arm protection  /Right arm protection
--Left lateral blade  /Left lateral scraper  /Right lateral blade  /Right lateral scraper  /Central blade
--discharge door cover
--Discharge door ledge
--End liners
--Wall liners

Material analysis:

Hardness     52-62HRC

useful life    more than 200000 cubic meter concrete or 300000 tons asphal

material   high chromium cast iron/steel

standard    CN:KM TB Cr 15-25-GTUS:ASTM A532 Class Two Type D
strength of extension  380 N/mm2
extension at break    1%
shock impact(resistance)value   >5 ak N.M/CM2
flexuralstrength  >600 ak N.M/CM2
certification:  ISO9001:2008,
metallographic organization M+M7C3+M23C6
processing type  Lost Foam Casting

Produce technology: 

1,the choosing of the chemical composition is scientific 

2,the exactly technology to control the temperature 

3,the advanced technology of heat treatment 

4,the advanced technology of melt and refine 

5,the advanced testing way 

6,the advanced technique and possess for smelt

  

Material

Chemical composition

Mechanical

 

Property

Micro

structure

Mn

Cr

C

Si

Ak/cm

HB

Mn13Cr2

11~14

1.7~2.2

1.1~1.4

0.3~1.0

>140

≤220

A+C

Mn18Cr2

16~19

1.7~2.2

1.1~1.4

0.3~1.0

>140

≤230

A+C

 

Chemical

Name

C

Mn

Cr

Mo

Ni

Cu

Si

Chemical

Ratio(%)

2.0~3.3

0.8~1.2

18~22

≥0.8

0.4~0.6

0.8~1.2

≤0.8

 

Chemical

Name

C

Mn

Si

Chemical

Ratio(%)

0.33~0.36

0.60~0.80

0.4~0.5

 
 



Castings in Construction - Steel

Material Mn13Cr2/Mn18Cr2
Hardness GB/T 5680-2010
Size According to drawing, customize
Warranty 1 year
Using Life  100,000 batch
Competitve Advantage Stable quality, Quick after-serive, On-time delivery


Material requirement: 
Castings in Construction - Steel
Manufacture Process:

Castings in Construction - Steel Castings in Construction - Steel


Company Introduction:
Company Profile

Castings in Construction - Steel

Company located in Jinghai District, Tianjin. It was founded on October,1995. From the beginning of its establishment, LXS has been engaged in the commitment to change the backwardness of the Chinese casting industry, which is large but weak. Our mission is to improve "Made in China to "Created/developed in China". We realize technological innovations through producing and developing the high-end wear-resistant materials. By conducting extensive and in-depth investigations and researches, we take the eternal of becoming the world's first-class enterprise in the high-end wear-resistant products field.

Through more than 20 years development, LXS has helped thousands clients for hundreds of milli testing projects and supplied our tailor-made products. We have successively entered three series of new wear-resist material markets of construction equipment, mining machine and grinding industry. We have designed and developed more than ten thousands sorts of high-end wear-resistant parts for construction machinery, sanding and graveling equipment, cement and building materials equipment, power industry, metallurgy and marine machinery, etc., we supply high-end wear-resistant products for many well-known domestic and foreign customers.

We have repeatedly carried out continuous innovations through designing and testing more than ten thousand varieties of products, obtained more than 70,000 test samples and hundreds of thousands of test data. Through the integration of independent R&D and production-research-application, we learn widely from professional advantages and complete our strengths from all available experts. By applying the laboratory economic mode of one institute, two bundries + scientific research universities/colleagues, we can systematically form a 5+3 scientific and techno innovation model. The core of this model is the long-term research on new materials, new processing, new products and new technologies in the genetic engineering material field, with the profound accumulation, we have been approved by Tianjin Science and Technology Commission as "Tianjin Wear-resistant Materials Engineering Center".


Test:
1. Chemical Analysis
2. Dimension Measurement
3. Heat-Treatment Record
4. Mechanical Property Test
5. Hardness Test
6. PT Test
  Workshop & Inspection:

High capacity and strict quality control

Castings in Construction - Steel
Packaging & Shipping

 


Castings in Construction - Steel
Castings in Construction - SteelCastings in Construction - Steel
FAQ

Q:Are you a factory or trading company?
A: We are a factory to manufacture high chrome, steel, maganese product for almost 30 years.

Q:Do you have strong experience on manufacture and installation?
A: Yes, definitely. We do have strong technicals and manufacture ablity. Our customers are world wide famous user, we have over 10 years stable business relationship.

Q:How's your quality?
A: Currently, we are the best quality supplier in Chinese market. Our feedback from customer is very good, no complain from domestic and international customers.


Q: What is the delivery time?
A: According to order items, basically our general manufacture period is 55 days once downpayment received.

Q: Payment method?
A: (i) 30% downpayment, 70% payment before order finish.
    (ii) Min
. order quantity: 1 piece.
   
(iii) 
Transportation: By air, sea, train.

Q: How to get correc product quotation?
A: Provide part number or key size or machinery series number

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours