Basic Info.
Model NO.
EB
Application
Machinery Parts
Machining
Boring Machine
Material
High Cr Cast Iron
Surface Treatment
Spray-Paint
Surface Roughness
Ra0.05
Standard
As2027 Cr35
Certification
CE, ISO 9001:2000, ISO 9001:2008
Size
According to Customer′s Drawings
Service
OEM ODM
Process
Sand Cast Process
Transport Package
Pallets
Trademark
EB
Origin
China
Production Capacity
10000 Tons Per Year
Packaging & Delivery
Package Size
30.00cm * 30.00cm * 30.00cm
Package Gross Weight
30.000kg
Product Description
1.Material Grade:
AS 2074/L2A, AS 2074/L2B,AS2074/LC,ZG42Cr2Si2MnMo,ZG45Cr2Mo,ZG30Cr5Mo, ZG40Cr5Mo(FED-4A);
2.Size:
As per drawings;
3.Process:
Sand Casting;
4.Hardness:
HRC33-43;
5.Suface Finish:
Ra.100;
6.The size tolerance:
As per CT13;
7.Application:
Mine,Ball,SAG and Cement Mill;
8.Package:
Packed by steel crates.
9.Chemical Composition:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment.
Irrevocable LC at sight.
AS 2074/L2A, AS 2074/L2B,AS2074/LC,ZG42Cr2Si2MnMo,ZG45Cr2Mo,ZG30Cr5Mo, ZG40Cr5Mo(FED-4A);
2.Size:
As per drawings;
3.Process:
Sand Casting;
4.Hardness:
HRC33-43;
5.Suface Finish:
Ra.100;
6.The size tolerance:
As per CT13;
7.Application:
Mine,Ball,SAG and Cement Mill;
8.Package:
Packed by steel crates.
9.Chemical Composition:
Standard Specification for Cr-Mo Alloy Steel: | |||||||||
Reference Standard | Nominal Chemical Composition (W%) | ||||||||
C | Si | Mn | P | S | Ni | Cr | Mo | ||
AS 2074/L2A | 0.45-0.55 | ≤0.75 | 0.50-1.00 | ≤0.04 | ≤0.04 | - | 0.80-1.20 | - | |
AS 2074/L2B | 0.55-0.65 | ≤0.75 | 0.50-1.00 | ≤0.04 | ≤0.04 | - | 0.80-1.50 | 0.2-0.4 | |
AS 2074/L2C | 0.70-0.90 | ≤0.75 | 0.50-1.20 | ≤0.04 | ≤0.04 | - | 1.30-2.40 | 0.2-0.4 |
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment.
Irrevocable LC at sight.