Basic Info.
Product Description
Customized Stainless Steel Lost Wax Casting Process:
pump, impeller, arm, bearing block, frame, connector, gearbox, manifold, exhaust pipe
ISO 9001:2008
1. Lost wax casting brief: step by step
All metal casting processes involve the creation of a mould into which molten metal is poured. The outstanding precision and excellent as-cast surface finishes achieved with investment casting are the result of a very precise series of steps as follo ws:
2. Inspection process:
In order to ensure the quality of the orders, our independent QC members to carry out strict inspection at each stage:
1. Inspection in-house and third party
2. All the products are strictly inspected by operator and skilled QC with record put down.
3. Universal inspection tools: hardness tester, height ruler etc.
Produce process: | Drawings→ mold making → pre-forging →rough machining or finish machining→ surface treatment →product checking→ packing →delivery |
Material Available: | Stainless Steel: SS201, SS202, SS303, SS304, SS316 etc. Steel: Q235, 20#, 45# etc. |
DRW format: | Auto CAD, Solid work, UG, CAD,IGS ,STEP, Step, SLDPRT,PDF |
Equipment: | CNC machining center, CNC lathe, general lathe, general milling, CNC milling, drilling machine, internal grinder, cylindrical grinder machine, center grinder machine , General lathes, Punch machines, polish machines, and other equipment. |
MOQ: | sample: 1-5pcs; mass production 500pcs~ |
QC System: | 100% inspection before shipment material certification are available upon request. |
Surface treatment: | sand blasting, shot blasting, anodizing, painting, electrophoresis, powder coating, polishing, etc |
4. OEM Parts: pump, impeller, arm, bearing block, automotive accessories,
machinery part, furniture part, hardware, casting accessories.
5. FAQ
Please send us information for quote: drawing, material, weight, quantity and request.
2. If we don't have drawing, can you make drawing for me?Yes, we make the drawing of your sample and duplicate the sample.
3. When can I get the sample?Sample: 25-30 days after you start to make mold. The accurate time depends on your product.
4. What is your main order time?Order time: 35-40 days after the payment. The accurate time depends on your product.
5. What is your payment method?Tooling: 100% TT advanced.
Main order: 50% deposit, balance 50% to be paid before shipment.
6. Which kind of file format you can read?PDF, ISGS, DWG, STEP, MAX..
7. If you export to our country before, can I get the information of your imported customers in our country?We can't offer you all the information of our customer because we have duty to protect our customers' privacy. But we can provide you some part of B/L
8. Our core competences:
· ISO9001:2008 certified company,TS16949 factory
· Conceptual design, Tooling design, Rapid prototyping
· Strict QA, QC system, project management
· More than 10 years' OEM/ODM service experience