Basic Info.
Product Description
Product Description
R&D | Softward: Solidworks, CAD, Procast, UG Development cycle of samples: 25-35 days |
Materials | Stainless steel: 304/304L, 316/316L, 410/416 etc Duplex stainless steel: 2250, 2507, Zeron 100 etc Carbon steel Alloy steel |
Technical Parameter | Part weight: 2g to 30kgs Max dimension : 600mm for diameter or length Min wall thickness : 1.5mm Casting roughness: Ra3.2-6.4 Machining roughness: Ra1.6 Tolerance of casting: CT6 Inner core: ceramic core, urea core, water soluble wax core. |
Heat treatment | Normalzing, Tempering, Quenching, Annealing, Quenching & Tempering, Caburization, Solution treatment. |
Surface treatment | Polishing, bead blasting, zinc plating, hot dip galvanized, nickel plating, passivation, Electro-polising, mirror polishing, Brush polishing, PE coating, Powder coating, etc |
Inspection | Cleanliness inspection, X-Ray radiographic inspection, MIM inspection |
Production capacity | More than 120 tons per month |
Quality Certificates | ISO9001:2015 IATF 16949. |
Investment Casting Workshop (Lost Wax Casting)
Secondary Operations and Treatment of Investment Castings We offer:
1.Surface Treatment: Sand Blasting,Polishing, Powder Coating, Painting,Brushed electropolishing,Chrome/Zinc Plating...
2. Machining: Broaching, milling, drilling, tapping, Laser Cutting...etc
3. Heat treatment :Annealing, tempering, Quenching, normalizing
QC Inspection
We have the chemical elements analysis centre and the mechanical testing centre which include the following quality control measures:
Spectrographic analysis, magnaflux crack detection, ultrasonic detection, dynamic fatigue testing, hardness testing, proof and ultimate breaking strength test... TUV DIN EN ISO 9001: 2000 & ISO/TS16949 available
In order to ensure the quality of the orders,
our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
(MIM Inspection)
Packing and Delivery
Any requirement on packing, please feel free to let us know
Packing instruction
FAQS
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold. Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.